Construction Bid Win Percentage

According to industry data, the average bid win percentage for a commercial contractor is 25%, meaning for every 10 bids submitted, they would win 2-3 projects.   (Public sector bid/win rations can be 10%-20%)

Key points to remember:
  • Variation by market and company size: This percentage can fluctuate depending on the specific market, project type, and the contractor’s reputation and experience within that market. 
  • Importance of tracking win rate: It’s crucial for contractors to actively monitor their bid win rate to identify areas for improvement and strategize for better bid submissions. 
  • Factors impacting win rate: Factors like pricing strategy, proposal quality, client relationships, and market conditions all play a role in a contractor’s bid win percentage.

 

Can the commercial construction contractor Bid/Win average of 25%  be significantly improved?

 

 The industry average of 25% largely reflects the inefficiencies in bid preparation, lack of trust in cost estimates, and inconsistencies in pricing.

Here’s how utilizing accurate cost data may make a difference:

  1. Improved Accuracy: Contractors can produce precise bids that reflect actual market conditions, reducing the risk of underbidding (leading to losses) or overbidding (leading to lost opportunities).
  2. Enhanced Credibility: Using objective, third-party data builds trust with clients, as it demonstrates a commitment to transparency and fairness in cost estimation.
  3. Faster Adjustments: With access to current local data, contractors can quickly and confidently adjust bids to reflect changes in the market, giving them an edge in fast-moving or competitive bid environments.
  4. Streamlined Negotiations: When cost data is verifiable and defensible, there’s less room for disputes, leading to quicker client approvals and stronger working relationships.
  5. Strategic Positioning: Contractors can better align their bids to client priorities, offering tailored solutions that provide value while staying competitive.

A 20% win rate means that for every 5 bids a contractor submits, they are likely to win one.  The win rate can fluctuate depending on the level of competition in the local public sector construction market.  That sad selectivity plays a key role.  To improve their win rate, contractors should be selective about which projects they bid on, focusing on those that align well with their expertise, market knowledge, and capabilities.

Improve Bid Win rations withthe use of defensible, verifiable local market cost data from an objective source.

The distinction between current local market cost data and national average cost data is critical when it comes to creating competitive and accurate bids. Here’s a deeper dive into the differences and their impact on winning bids:

Local Market Cost Data

  • Definition: This data is specific to a geographic region, reflecting real-time labor rates and trade variance due to workers comp and other variables, material costs, subcontractor pricing, and equipment rental costs in that area. It often accounts for local economic conditions, supply chain variability, and contractor availability.
  • Advantages:
    1. Accuracy: Local data ensures that bids reflect the actual costs contractors will face, reducing errors that lead to profit loss or missed opportunities.
    2. Competitiveness: It helps contractors align their pricing with what the market can bear while maintaining profitability, increasing their chances of winning bids.
    3. Transparency: Using local data builds trust with owners, as it eliminates reliance on generalized estimates that might not hold up in specific regions.
    4. Risk Mitigation: Contractors can better anticipate and account for local factors like union labor rates, taxes, or transportation costs that might otherwise lead to surprises.

National Average Cost Data

  • Definition: This data provides an excellent generalized view of costs across the country, typically derived by averaging costs from various regions or cities. It may include factors such as city indices or adjustment multipliers, in addtion to economic indexes.
  • Drawbacks:
    1. Inaccuracy: National averages often mask significant local variations. For example, material costs can vary widely between urban and rural areas, or between regions experiencing a building boom versus a slowdown.
    2. Economic Adjustment Factor Issues: Adjustment factors attempt to localize national data but often fail to capture nuanced market shifts, such as material shortages or changes in subcontractor demand. Errors of 30–40%+ are common.
    3. Missed Opportunities: Over-reliance on national averages may lead to bids that are either too high to be competitive or too low to cover actual costs.
    4. Lack of Trust: Owners may question the validity of estimates derived from national data, particularly if local conditions are visibly different.

Construction Bid Win Percentage

Construction Bid Win Percentage

Impact on Winning Bids

  • Contractors using current, granular local market cost data consistently outperform those relying on national averages because they can:
    • Submit bids that more closely reflect the owner’s expected costs and market conditions.
    • Justify their pricing with objective, defensible data that withstands scrutiny.
    • Adjust bids dynamically to match current trends, such as labor shortages or seasonal fluctuations.
  • In contrast, reliance on national average cost data often leads to overgeneralized bids that fail to address the unique challenges and opportunities in the local market.

Case Study Comparison

  • Local Market Data Bid: A contractor in a booming city uses granular data on current labor shortages and adjusts their bid to include higher subcontractor costs. They win the bid because their pricing is realistic and credible, even though it is higher than competitors relying on outdated national averages.
  • National Average Data Bid: Another contractor in the same city applies a flat economic adjustment factor to a national average, underestimates subcontractor costs, and submits an unrealistically low bid. The bid is rejected as infeasible during review.

Sampling of BiD/WiN Rates by Sector

Public works = 10% – 17%

Private bids = 17% – 25%

Negotiated work = 25% – 50%

Design-build jobs = 25% – 50%

How to Leverage Local Market Data

  1. Source Objective Data: Use verified cost data from tools or organizations specializing in regional markets. Avoid databases focused primarily on procurement or industry averages unless they include truly localized data.
  2. Integrate with Cost Management Practices: Implement frameworks like Collaborative Job Order Contracting (JOC), Integrated Project Delivery (IPD) or similar Lean Construction methodologies, which emphasize transparency and objective cost management.
  3. Regular Updates: Ensure the cost database is frequently updated to reflect rapid market changes.  (Note:  Quarterly updates are recommended.)
  4. Collaborate with Stakeholders: Share local data with owners to build trust and transparency during the bidding process.

In short, while average construction bid win percentage for a commercial contractor is 25%, bit can be significantly improved via enhanced cost certainty for all stakeholders.

In Summary

  • Identify the Right Projects to Bid
  • Ensure a Mutually Understood Detailed Scope of Work – SeekClarifications and Avoid Assumptions
  • Track and Analyze Bid-Win Ratios
  • Create Supportable Detailed Cost Estimates Using LOCAL MARKET labor, material, and equipment Data
  • Verify Subcontractor Quotes
  • Identify and Manage Risks
  • Conduct Post Award Debriefs wherever possible