Objectively Verify and Quantify Costs specific to actual location for PM Labor, Materials, and equipment replacement as required
Ensure proper timing and checklists for all PM tasks
Record and Document that all equipment is receiving required maintenance per defined schedule
Over 2500 Preventive Maintenance tasks organized by expanded UNIFORMAT. Each PM task is based upon industry standards, each with multiple checklists for a specific frequency, as well as associated labor, material, and total cost.
Planned, systematic, targeted, cost-effective, and managed preventive maintenance.
Fully transparent scope of work, schedule, and costs.
4BT exclusively enables real property owners and facilities management to adopt efficient preventive maintenance strategies via robust industry standards. We support vital stewardship of the built environment for owners, users, and the community.
Cost-effective preventive maintenance
Local market costs for all preventive maintenance activities, processes, and procedures.
Simple integration into CMMS software of other maintenance management systems.
Superior to benchmarking or reliance upon contractor quotes.
Enables quantitative measurement of continuous improvement.
Support for sustainability initiatives.
Industry standard terms and data architecture
The only objective resource for local market maintenance management requirements and cost management and improving process flows. A foundational asset for foundational asset management systems-based thinking.
Maintenance Strategy Considerations
The success of facilities / built environment maintenance efforts is dependent on a robust maintenance strategy and its proper execution/management. From a technology perspective, a CMMS (computerized maintenance managemen system) can support the adopted maintenance strategy, however, alignment is required as well as the use of objective, independent, and current preventive maintenance cost data and appropriate checklists.
Effective Preventive maintenance (PM) is a critical component of facilities lifecycle asset management and necessary to cost effectively meet organizational functional requirements.
Preventive Maintenance – Planned actions are undertaken to retain an item at a specified level of performance by providing repetitive scheduled tasks which prolong system operation and a useful life, i.e. inspection, cleaning, lubrication, part replacement. (Cotts, Lee, 1992)
Efficient preventive maintenance requires a robust programmatic process supported by a detailed knowledge base of required tasks, frequencies and associated labor and material costs. A proven suite of processes and tools ensures the appropriate optimization of critical facilities systems throughout their lifecycles in concert with an organizations core mission.
Schedule and perform regular inspections and perform requisite equipment maintenance tasks from a defined requirements list to ensure optimal performance and energy efficiency, including but not limited to…
Lubrication of moving parts
Leak checking
Cleaning and mechanical adjustments
Filter cleaning/replacements
Fluid level/gas monitoring/replacement
Measurements/alignments
Controls adjustment
Repair and replace any defective equipment/parts
Maintenance Considerations
1 What are the functions and associated performance standards of the asset and operating context?
2 In what way(s) does it fail to fulfil its functions?
3 What causes each functional failure?
4 What happens when each failure occurs?
5 In what way does each failure matter?
6 What can be done to predict or prevent each failure?
7 What should be done if a suitable proactive task cannot be found?
Failure Mode Effects and Criticality Analysis (FMECA).CMMS Modules / FunctionalityEquipment reliability and availability (ERA)
Steps to Facilities Lifecycle Asset Management Improvement
A current real property inventory of all critical facilities systems – Foundations, Floors, Exterior Walls, Exterior Windows, Exterior Doors, Roof Coverings, Interior Construction, Casework, Doors, Partitions, Interior Windows, Stairs, Wall Finishes, Floor Finishes, Ceilings, Elevators/Lifts/Conveying Systems, Plumbing, Domestic Water Equipment, Sanitary Waste, Specialty Piping Systems, Gas Monitors, Flow Monitors, Liquid Oxygen Source, Evacuation Systems, Compressors, Compressed Air Systems, Plumbing Fixtures, Surgical Vacuum Systems, Dust Evacuation Systems, Energy Supply Systems, HVAC, Terminal and Package, Solar Energy Systems, Generators, Steam Distribution Systems, Cooling Systems, Distribution Systems, Energy Supply Systems, Heating Systems, Controls and Instrumentation, Fire Suppression Systems, Fire Detection and Alarm Systems, Standpipes, Electrical Service and Distribution, Lighting, Communications and Security Systems, Institutional Equipment, Landscaping and Sitework…. to name a few.
Implement a robust physical asset lifecycle management process
Validate costs and operations using a current, locally researched PM construction cost database for all tasks and associated frequency.
…..
Learn more?? Just reach out.
(Source of the below: https://www.wbdg.org/facilities-operations-maintenance/operation-maintenance-planning 8/2/2024)
Total life-cycle costs include initial design, construction, operations, maintenance, renovation, and demolition. As Figure 1 illustrates, 80% of a facility’si life-cycle costs are associated with Operation & Maintenance (O&M). A well-developed strategic O&M Planii will define and communicate best management practices (BMPs) for an organization.
Description
Developed by the organization, a strategic O&M Plan (hereinafter referred to as the Plan) provides guidance for decreasing life-cycle O&M costs, extending the lifespan of facility systems, reducing response times to facility issues, improving personnel satisfaction levels, etc. The Plan is not a static tool, but a living document that is consulted and regularly updated. It serves as a primary tool for communicating O&M strategies and desired outcomes.
Figure 1. A flow chart of Life-cycle Management
O&M planning considerations include the following:
Strategy & Goals
Budgeting & Capital Planning
LEAN Methodology
Multiple Competencies, Business Processes, and Activities
Supporting Technologies and Tools
Education, Training, and Support Services
Metrics/Key Performance Indicators (KPIs)
Strategy & Goals
Strategy
Establishing, documenting, communicating, and improving an organization’s overall O&M strategy greatly aids stakeholders (i.e. facilities management staff, senior management, facilities users, external service providers, oversight groups, etc.) to better understand and appreciate the importance of proper funding and support.
Operations incorporate all services required to ensure that facilities will do what they are designed to do, critical throughout the life-cycle of a facility. Service requirements, including life-cycle cost information are shared among organizations and individuals, from initial concept through demolition. (Refer to Multiple Competencies, Business Processes, and Activities).
There are several types of maintenance that can be grouped into two, high-level categories: Planned Maintenanceiii and Corrective Maintenanceiv (see Table 1).
Table 1. Planned vs Corrective Maintenance Delineation
Planned Maintenance
Corrective Maintenance
Routine/Preventive Maintenancev
Unplanned Maintenancevi
Predictive Maintenancevii
Emergency Maintenanceviii
General Maintenanceix
User Requested Needs
Determining the allocation of limited resources in favor of planned versus corrective maintenance is a primary objective of any organization. On average, corrective maintenance costs three to five times or greater (3x — 5x+), more than planned maintenance, not including associated disruptions to work or services being performed in the facilities (education, healthcare, production, etc.). Properly allocating funds for planned maintenance can significantly reduce overall negative financial and operational impacts upon an organization, as illustrated in the Pavement Condition Index (Figure 2).
Figure 2. Pavement Condition Indexx
Planned maintenance contributes to limiting the frequency and negative impact of corrective maintenance occurrences thereby reducing overall O&M costs.
Planning helps an organization to better leverage the experience and value of internal and external resources, throughout a facility’s life-cycle. Proper planning can quantitatively determine sufficient O&M funding and help to build and maintain requisite capabilities to successfully execute the Plan, including providing incentives to optimize O&M practices.
Goals
The following are potential O&M goals and important considerations:
Maximize asset value
Extend asset value
Incorporate a life-cycle costing perspective
Reduce O&M costs
Mitigate risk and unplanned events
Enhance facility user experiences and increase satisfaction
Establish and assure O&M funding levels
Continuously enhance capabilities of internal and external personnel
Provide a “customer—centric” LEAN operating model
Communicate the importance of regular maintenance
Assure appropriate staffing levels and capability
Consider decommissioning costs
Identify all parties responsible for and linked to O&M
Clarity roles and responsibilities
Asset inventory
Standardized and ongoing physical and functional condition assessments
Decision support tools to assist in project prioritization
Start-up and normal operating procedures
Support technology, records, and reporting system
Monitoring, metrics, and key performance metrics (KPIs)
Public notifications & permits
Life/safety issues
Environmental issues
Emergency operating procedures
Budgeting and Capital Planning
Since 80% of total capital expended across the lifespan of a facility goes to O&M, O&M activities are almost always inadequately funded.
Collecting and dissemination information to key decision-makers such as Senior Facilities Management and the Chief Financial Officer will help acquire funding, improve facilities services, and reduce equipment down time. The use of common terms versus technical jargon, emphasizing risk mitigation, clearly defining organizational benefits and clearly defining timelines can help communicate those needs.
The ability to predict current and future requirements necessary to maintain a predetermined service level aids Planning. Considerations include the following:
Manpower requirements/staff (In-house and Third-Party/Contract Maintenance)
Current and desired conditions of buildings systems and equipment
Required documentation – for example O&M Manuals
Detailed (line item) O&M task descriptions (labor, material, & equipment line items and associated costs), and checklists
Estimated service life for physical assets
Maintenance, repair, and replacement costs
Operating Costs
Determining the priority of capital reinvestment into facilities based upon a life-cycle perspective has proven to provide the highest likelihood of positive overall results. Many organizations spend a significant amount, and some even the majority, of O&M funds on emergency, unplanned projects and/or projects. The result is an inability to maximize value to an organization.
Lean Methodology
LEAN methodology was first introduced by Henry Ford, later expanded by Toyota, and subsequently adopted my many manufacturing and service sectors. An understanding of LEANxi fundamentals and their application to O&M and overall Facilities Management will benefit Planning. Briefly, the LEAN methodology involves the consistent application of business processes and workflows in support of the following:
Early and ongoing collaboration among all participants and stakeholders
Focus upon client requirements and best value outcomes
Clearly defined and documented roles, responsibilities, workflows
Shared, performance-based risk/reward
Decision support based upon current and actionable information
Common terms, definitions, & data formats — Common data environment (CDE)
Mutual trust and respect among participants
Continuous improvement the O&M Plan and associated processes
Specific to O&M, LEAN practices help provide a framework to integrate and maximize the capabilities of available people, processes, information, and technology to address ongoing facilities requirements, as Figures 3 through 5 illustrate. Promoting awareness and education of LEAN O&M best management practices leads to improved outcomes.
Figure 3. LEAN Practices for Optimized Facilities O&M Overview
Figure 4. LEAN Practices Asset Competency Model
Figure 5. LEAN Considerations
Multiple Competencies, Business Processes, and Activities
Facilities O&M management spans multiple competencies (core skills), business processes (asset management practices/industries), and activities, such as the following (also, see Figure 6).
Competencies/Activities
Strategic planning
Cost estimating
Procurement/bidding
Construction
Space planning
Operations
Maintenance
Programming
Business Processes
Capital planning and management
Construction project delivery methodology
Space management
Operations & Maintenance
Inventory and maintenance disposition management
Figure 6. Life-cycle Management
NOTE: The term “Big Data” has recently become popular to describe the multiple sources, formats, and uses of data that can be leveraged to monitor and improve organizational performance. The Construction Operations Building information exchange (COBie) has become one of the most widely known data formats. COBie is an information exchange specification for the life-cycle capture and delivery of information needed by facility managers. It can be viewed in design, construction, and maintenance software as well as in simple spreadsheets. Other data formats include MasterFormat, Uniformat, and Omniclass.
Supporting Technology and Tools
Technology and tools used to lower the cost of implementing and managing LEAN O&M best management practices (BPMs) include the following:
Technologies
Application Software
Building Automation Systems (BAS)
Building Information Modeling (BIM) (Model & Management Systems) Capital Planning and Management Systems (CPMS)
Computer-aided Facilities Management Systems (CAFM)
Computerized Maintenance Management Systems (CMMS)
Cost Estimating, Procurement, & Construction Project Delivery and Management Systems
Geographical Information Systems (GIS)
Integrated Workplace Management Systems (IWMS)
Tools
Construction code databases
Construction cost databases
Industry specific glossaries
Industry Standards (ISO, NIST)
O&M Plan
O&M Manuals
Standardized data architectures (Cobie, Masterformat, Uniformat, Omniclass)
Technical construction specifications
Education, Training, and Support Services
Building the capabilities of internal and external O&M teams involves an ongoing commitment to education and training. From an educational standpoint, both traditional educational institutions and ongoing professional education are increasing their focus upon life-cycle management and the role of O&M.
The need for and level of training requirements, including training aids and O&M manuals, should be specified in the Plan. The type of training (introductory, advanced, certification), format (online/virtual, classroom, self-taught), and frequency is dependent upon each organization’s requirements, types of systems and equipment, and amount of work performed by in-house staff versus that to be outsourced. Support services may include outsourcing certain O&M requirements, independent and/or peer-based audits of O&M practices, and various consulting services.
Metrics/Key Performance Indicators (KPIS)
Ongoing performance measurement supports informed, information-based, decision making and helps to maximize the use of available resources.
From a generic perspective, an effective measurement system includes the following:
Clearly defined, actionable, and measurable goals
Key performance indicators that monitor the overall administration of O&M program, as well as individual projects / task orders, and all associated workflows, deliverables, and outcomes
Established baselines enabling measurement of historical and current progress
A basis of timely, accurate, repeatable, and verifiable information based upon standardized terms, definitions, and data architectures
Applicable reporting and feedback systems to support continuous improvement of processes, practices, and outcomes
Leading Indicators (forecast future trends inside and outside the organization) as well as lagging indicators
Objective and unbiased information (not subject to manipulation) that is normalized (can be benchmarked against other organizations, departments, locations)
Statistically reliable
Unobtrusive (not disruptive of work or trust)
Appropriate (measures the right things)
Quantifiable
Verifiable/auditable
The importance of performance measurement cannot be understated. It is a fundamental element of any successful O&M program.
O&M performance indicators include the following:
Annualized Total Cost of Ownership (TCO) per building per gross area = Rate per square foot
Annualized TCO per building/Current replacement value = Percent of Current Replacement Value (CRV)
Annualized TCO per building/Net assignable square feet = Cost rate per net assignable square feet per building
Annualized TCO per building/Non-assignable square feet = Cost rate per non-assignable square feet per building
Annualized TCO per building/Building Interior square feet = Cost rate per interior square foot per building
Churn Rate
Utilization Rate
AI (Adaptation Index) or PI (Programmatic Index) = PR (Program Requirements)/CRV (Current Replacement Value)
Uptime or Downtime = Defined in percent, as amount of time asset is suitable for the program(s) served
Energy Usage is expressed as a ratio of British Thermal Units (BTUs) for each Gross Square Foot (GSF) of facility, group of facilities, site or portfolio = BTUs / Gross Area GSF
Utility Costs per square foot
Waste Removal Costs per square foot
Facility Operating Current Replacement Value (CRV) Index = Facility Operating CRV Index = Annual Facility Maintenance Operating Expenditures ($)/Current Replacement Value ($) (SAM Performance Indicator: APPA 2003)
Facility Operating GSF Index = Annual Facility Maintenance Operating Expenditures ($)/Gross Area (GSF)
Planned/Preventive Maintenance Costs per square foot
Emergency Maintenance Costs as a percentage of Annual Operations Expenditures
Unscheduled/Unplanned Maintenance Costs as a percentage of Annual Operations Expenditures
Repair costs (man hours and materials) as a percentage of Annual Operations Expenditures
AI (Adaptive Index) or PI (Programmatic Index) = PR (Program Requirements)/CRV (Current Replacement Value)
FQI (Facility Quality Index) or Quality Index or Index = FCI (Facility Condition Index)+ AI (Adaptive Index)
Capital Renewal Index = Annual Capital Renewal and Renovation/Modernization Expenditure ($)/Current Replacement Value ($)EMERGING ISSUES
Challenges and Obstacles
While obtaining adequate O&M funding remains an elusive goal for many, the most significant challenge is change management. Facilities span the careers of individuals, and O&M management transcends generations. As a result, known future impacts may be postponed until “someone else’s watch.” Further, the impact of new strategies and processes can take years to show measurable improvements. Within a society that seeks instant gratification and financial payback periods sometimes measure in months versus years, the need for leadership and commitment of property owner management is paramount.
Additionally, the importance of facilities in the minds of senior management may not be fully appreciated, thus creating the need to better inform them of associated risks and benefits of various O&M strategies. Here, a somewhat pervasive focus upon first-costs versus lifecycle costs must be addressed and altered. Communicating the fact that an emergency repair will have ten times (10x) the cost of an appropriate maintenance operation, is an ongoing need, as well as providing cost multi-year cost impacts of alternative O&M strategies.
Historically, sharing information has been somewhat problematic for a variety of reasons, especially in areas involving costs and or techniques. This obstacle can result in higher costs and marginalized capabilities if not fully addressed. The level of collaboration and transparency required is a change in the way many organizations operate on a day to day business.
i The term “facility” is used to represent any built structure including, but not limited to, buildings, roadways, dams, bridges, airports, mass transit, etc.
ii An O&M Plan may also be called a O&M Execution Plan.
iii Planned maintenance is any scheduled service performed to ensure that equipment operates correctly and to therefore avoid any unscheduled breakdown that may require corrective maintenance.
iv Corrective maintenance will identify, isolate, and rectify a fault to restore equipment to an operational condition within established requirements for operations.
v Cyclical, planned work activities funded through the annual budget cycle, done to continue or achieve either the originally anticipated life of a fixed asset (i.e., buildings and fixed equipment), or an established suitable level of performance. Normal/routine maintenance is performed on capital assets such as buildings and fixed equipment to help them reach their originally anticipated life. Deficiency items are low in cost to correct and are normally accomplished as part of the annual O&M funds. Normal/routine maintenance excludes activities that expand the capacity of an asset, or otherwise upgrade the asset to serve needs greater than, or different from those originally intended. Planned or Programmed Maintenance, a detailed category that includes those maintenance tasks whose cycle exceeds one year. Examples of planned or programmed maintenance are painting, flood coating of roofs, overlays and seal coating of roads and parking lots, pigging of constricted utility lines and similar functions.
vi Unscheduled/Unplanned Maintenance and non-emergency corrective work activities that occur in the current budget cycle or annual program. Activities may range from unplanned maintenance of a nuisance nature requiring low levels of skill for correction, to non—emergency tasks involving a moderate to major repair or correction requiring skilled labor.
vii Testing, or inspection performed to anticipate failure using specific methods and equipment, such as vibration analysis, thermographs, x—ray or acoustic systems to aid in determining future maintenance needs. For example, tests to locate thinning piping, fractures or excessive vibration that are indicative of maintenance requirements.
viii Emergency Maintenance is unscheduled work that requires immediate action to restore services, to remove problems that have interrupted activities, or to protect life and property.
ix General maintenance: custodial services and cleaning, pest control, snow removal, grounds care/landscaping, trash-recycle removal.
x Quantifying Quality: The Pavement Condition Index, July 14th, 2016 Diksha Radhakrishnan Intern.
xi The most widely known LEAN methods applied to construction, operations, and maintenance are Job Order Contracting (JOC) for maintenance, repair, and renovation activities and Integrated Project Delivery (IPD) for major, new construction.