PROVEN FORMULA FOR EFFICIENT FACILITIES Repair, Renovation, Maintenance, and New Construction

PROVEN FORMULA FOR EFFICIENT FACILITIES Repair, Renovation, Maintenance, and New Construction

Robust Process Integration + Common Shared Cost/Technical Information + Supporting Tech = Measurably Improved Cost Management

Integrating People, Process, Information, and Technology with proven industry best practices and organization-specific requirements into a proven cost management solution.  Create estimates, deploy project workflows and controls, inclusive of timelines, approval stages, appropriate information access, and more.

Put an end to poor traditional planning, cost estimating, procurement, and project delivery practices!

Manage costs of all types: Effort (labor, crews, timelines), quantities, materials, and equipment. Create verifiable cost requirements and performance baselines based upon current, locally researched, granular line-time cost data.

  1. 84% gain in higher-quality construction

  2. 41%-74% reduction in project schedules

  3. 43%-77% increase in productivity

  4. An 80% improvement in customer satisfaction

Exclusively from 4BT! (Four BT, LLC) – www.4bt.us

1) Specify and fully communicate tasks, processes, and costs among internal and external teams.

2) Empower those on-site who are doing the work.

3) Assure full visibility at all levels…. Program, Project, Estimate, Document, Work Order, Owner, Contractor Subcontractor

4) Manage all changes and approvals before moving to the next phase/stage

5) Measure performance – KPIs

6) Continuously Improve

7) Enable real-time information availability and sharing with collaborative cloud technology

 

 Lower costs, smaller bureaucracies, and prescient leaders have helped them respond nimbly to both infrastructural and cultural changes.