Tech Won’t Save FM

Here why Tech Won’t Save FM.
Despite decades of technological advancement, facilities management (FM) fundamentally remains inefficient with respect to the lifecycle management of the built environment. A pervasive reliance on outdated processes and fragmented data systems means that organizations still grapple with a lack of real-time visibility into their portfolios regarding inventory, condition, and operational costs. This systemic deficit is further exacerbated by the absence of objective, granular local market cost data, leading to budgeting inaccuracies and an emphasis on costly, reactive maintenance rather than strategic, predictive upkeep. The prevailing disconnect between leadership and practitioners, coupled with a failure to integrate robust planning, procurement, and project delivery frameworks, ensures that risk management is hampered at every level of operation, from the portfolio down to individual work orders. Ultimately, without standardized, valid data and integrated intelligence, the industry continues to struggle with waste, hidden costs, and suboptimal asset performance. 
Tech Won't Save FM
• Real-time visibility is remains a major barrier.
• Risk structures are still not adequately defined or understood.
• Lack of current, objective, verifiable and actionable data.
• Disconnect between leadership and practitioners.
• Zero accountability

References
  • NEST (2019) Reactive maintenance with integrated facilities management. Available at: https://www.enternest.com/blog/fight-back-against-reactive-maintenance-with-integrated-facilities-management (Accessed: 5 November 2025).
  • Fexa (2025) Data & analytics guide for facilities management. Available at: https://fexa.io/guide/data-analytics-guide-for-facilities-management/ (Accessed: 5 November 2025).
  • ARC Facilities (2024) Data-driven facility management. Available at: https://www.arcfacilities.com/blog/data-driven-facility-management (Accessed: 5 November 2025).
  • City Facilities Management US (2025) Reactive maintenance vs. preventive maintenance explained. Available at: https://www.cityfm.us/blog/reactive-maintenance-vs-preventive-maintenance/ (Accessed: 5 November 2025).
  • Adamtey, R. (2021) ‘Transforming project delivery: integrated project delivery’, in Transforming project delivery: integrated project delivery. Available at: https://www.researchgate.net/publication/363134454_Transforming_project_delivery_integrated_project_delivery (Accessed: 5 November 2025).
  • IFMA (2024) A facility manager’s guide to building a relationship with AI. Available at: https://s3.us-east-2.amazonaws.com/knowledgelibrary.ifma.org/KL_Documents/FNL_AI%20in%20FM%20REPORT.pdf (Accessed: 5 November 2025).
  • Kesari, G. (2025) ‘A maintenance revolution: reducing downtime with AI tools’, MIT Sloan Management Review. Available at: https://sloanreview.mit.edu/ (Accessed: 5 November 2025).